High Visibility Crosswalks, ADA Ramps, and Speed Humps Project (Completed)

07-29-2025 34thStChillumRd-2 Safe Streets (14)
07-29-2025 34thStChillumRd-2 Safe Streets (2)

The first of 10 key projects – High Visibility Crosswalks, ADA Ramps, and Speed Humps Project began in  June 2025 and was completed in August 2025.. The first of the 10 key projects outlined in the Vision Zero Action Plan begins in June 2025. Following a public bidding process, the City has awarded Grace Management and Construction the contract to install high-visibility crosswalks, ADA-compliant curb ramps, and speed humps (based on 60% block signatures’ petition) throughout the city.

Summary of Project: 

  • ADA Accessibility: 120 new ADA curb ramps improving pedestrian access and safety at designated priority intersections across the City.
  • Pedestrian Visibility: 54 thermoplastic (high visibility) crosswalk legs to enhance visibility and reduce conflict risks at crossings.
  • Traffic Calming: 7 speed humps installed on neighborhood streets where excessive traffic volumes and vehicle speeds were documented, supporting Vision Zero objectives.

High Visibility Crosswalks, ADA Ramps, and Speed Humps Project Locations (PDF)

Status

Work on the High-Visibility Crosswalks, ADA Rams, and Speed Humps Project was temporarily suspended in November 2025 due to the cold weather conditions. Contractors will resume work in spring 2026.